Week 11
On Saturday
me and my day solved the problem with the go cart
we used a trolley a a chair to stabilize the back but kept the original front and finally we had finished the go cart
On Saturday
me and my day solved the problem with the go cart
we used a trolley a a chair to stabilize the back but kept the original front and finally we had finished the go cart
Week 10
The past weeks we have been a bit slack on what we are doing so this week i am taking our yet to be built go cart home to get some more help on it.
Go Cart-Jak, Will, Harry and Darren
DAY 1: Week 4
TodaY was the first day of our Passion Project. We started designing our go kart with the wood harry brought to school. To find our design we went onto google images. After that we all went to the mat and sat on bean bags so we could do something each for the go kart. Darren wrote down all the tools we need, Harry and will were having a look at how to design it well, and I as in Jak, was left to write the revision. When we all finished we packed up and got ready for lunch. So that was the end of day 1.
Week 5
No passion project
No comments:
Post a Comment